Dear All,
The requirement is after the lead gets created an activity needs to get generated at the back end which is currently happening, however the start date of the activity should be 3 days post the lead creation date.
I have created a Z action profile and assigned the method as COPY_DOCUMENT the permitted processing types of action is Method Call.
However the activity is getting created as the same day on the day the lead is getting generated, what modifications should I make for the start date in the activity to get triggered after 3 days?
Please advice.
Kind Regards
Atul